If your roof is not having any shade from adjacent buildings, trees etc. and its structure is not delicate, then your roof is suitable for installation of solar plant.
There is no limit if the roof is GI Sheet.
There is no limit if the roof is RCC.
There will be a limit for a period of 10 years for Asbestos sheet.
Net Metering is a system that allows individuals and businesses generating their own electricity to deliver the unused energy back to the local power grid and get credited back for the retail price.
When more electricity is produced by the system than being used, it causes the electric meter to spin backwards. At the end of the month, the customer is billed for the difference or the ‘net’ amount of electricity used over a month’s time. This arrangement is called net metering.
Does rain affect the performance of solar plant
The electricity generation of the plant suffers during rainy and cloudy days especially during the monsoon season, but the generation never drops to zero. The loss of generation during monsoon and other rains is already adjusted in the 1.3 to 1.5 Lakhs unit/100kWp/annum generation number.Annual maintenance contract will be provided by MAS Solar Systems (4 visits per year)
AMC for 120 KW Solar Roof Top Power Plant Rs.1, 50,000 (approx).
Below are the approximate costs for a 120 KW set up:
Rs. 50 to 55 lacs for larger commercial & industrial sector.
PV Capacity *hrs*CUF*Days
EXAMPLE :
100KW * 24hrs * 21% * 31days = 15624 Units
Networking charges :
15624 Units * 1.48 * 100% = Rs.23124
GST on network charges = 18% CGST 9% and SGST 9%
=23124 * 18% = Rs.4162
=23124 + 4162 =Rs.2728
You can write a mail to marketing@massolarsystems.com or you could fill the form.
Biggest concern is the huge electricity bills for the industries.
The power tariff would be hiked every year based on inflation for all the consumer categories.
Industrial Solar modules can be used for both On-Grid and Off-Grid Solar systems making it lucrative for Industries to use solar power usable at night also.
Commercial, industrial, and domestic consumers make up the three main types of electricity users in India.
The industrial sector’s peak-hour pricing may increase further.
Therefore, using industrial solar modules is the best option to reduce electricity bills in a long run.
Industrial companies with captive ‘industrial solar power systems also get to avail of tax benefits by way of depreciation, capital subsidies and other incentives as applicable. Every sector, including hospitals, technology firms, consultants, government agencies, non-profit groups, industrial facilities, and the consumer packaged products industry, are working cooperatively to maximize its socially and environmentally friendly solution by switching to solar power.
A 1-megawatt solar power plant can generate 4,000 units per day on average. So, therefore, it generates 1, 20, 000 units per month and 14, 40,000 units per year.
One megawatt (MW) = 1,000 kilowatts = 1,000,000 watts.
Watts are used to measure the power of most electrical devices. So, we conclude that such equipment will create 1000 units of energy per hour at 100% efficiency, as 1 MW equals 1000 KW, and one Kw for one hour equals 1 kWh or 1 unit of electrical energy. So, one megawatt is equal to 1000 units.
Megawatt [MW] | Kilowatt [KW] |
---|---|
1 MW | 1000KW |
2 MW | 2000KW |
3 MW | 3000KW |
4 MW | 4000KW |
5 MW | 5000KW |